Southern Water Services Limited
Customer named in the DNOs’ registers
In UKPN’s November 2026 and SSEN’s November 2026 editions
The registers spell this customer’s name more than one way: “Southern Water Services Limited” (10 sites) and “SOUTHERN WATER SERVICES LIMITED” (1 site).
Capacity by DNO
Capacity by technology
| Technology | Sites | Capacity | Connected | Accepted to connect |
|---|---|---|---|---|
| Gas and other fossil | 7 | 10.2 MW | 10.2 MW | – |
| Bioenergy and waste | 4 | 4.9 MW | 4.9 MW | – |
Each site is grouped by its first energy source, as the register names it.
Sites
Each site under this name in the DNOs’ latest editions, the largest first.
Site, company and substation names are shown as they appear in the registers, including capitalisation.
| Site | DNO | Grid supply point | Technology | Status | MW |
|---|---|---|---|---|---|
| Hardham PS | UKPN | Bolney | Gas and other fossil | Connected | 2.2 |
| Forness Point Pumping Station | UKPN | Richborough/Sellindge 132kV | Gas and other fossil | Connected | 1.8 |
| Burham Treatment | UKPN | Kingsnorth | Gas and other fossil | Connected | 1.7 |
| SOUTHERN WATER SERVICES LIMITED | SSEN | NURSLING GSP | Bioenergy and waste | Connected | 1.425 |
| Bexhill & Hastings WTW | UKPN | Ninfield | Bioenergy and waste | Connected | 1.37 |
| Northfleet WTW 324327 | UKPN | Northfleet East | Gas and other fossil | Connected | 1.25 |
| Kingshall Sewage Works S/S 343185 | UKPN | Canterbury | Gas and other fossil | Connected | 1.2 |
| Bybrook Sewage Works Phs 2 | UKPN | Richborough/Sellindge 132kV | Bioenergy and waste | Connected | 1.15 |
| Goddards Green WTW 511298 | UKPN | Bolney | Bioenergy and waste | Connected | 1 |
| Queenborough Sewage Works | UKPN | Kemsley | Gas and other fossil | Connected | 1 |
| Ramsgate Harbour | UKPN | Richborough/Sellindge 132kV | Gas and other fossil | Connected | 1 |
Grid supply points
Each grid supply point its sites are at, with the capacity of its own sites there.
| Grid supply point | DNO | Sites | Connected | Accepted to connect |
|---|---|---|---|---|
| Richborough/Sellindge 132kV | UKPN | 3 | 4 MW | – |
| Bolney | UKPN | 2 | 3.2 MW | – |
| Kingsnorth | UKPN | 1 | 1.7 MW | – |
| NURSLING GSP | SSEN | 1 | 1.4 MW | – |
| Ninfield | UKPN | 1 | 1.4 MW | – |
| Northfleet East | UKPN | 1 | 1.3 MW | – |
| Canterbury | UKPN | 1 | 1.2 MW | – |
| Kemsley | UKPN | 1 | 1 MW | – |
What changed recently
Changes to its sites found in both editions of each pair, newest first.
UKPN, October 2026 edition to November 2026 edition, for this customer’s sites: 10 sites matched. Every October site and every November site had a match in the other edition.
SSEN, October 2026 edition to November 2026 edition, for this customer’s sites: 1 site matched. Every October site and every November site had a match in the other edition.
- SOUTHERN WATER SERVICES LIMITEDSSEN, April 2025 editionTechnology stated as Bioenergy and waste (not stated in the March 2025 edition)
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?