Distribution / Sites / Customer

Enviromena Project Management UK Limited

Customer named in the DNOs’ registers

In UKPN’s November 2026, NGED’s August 2026 and SPEN’s September 2026 editions

The registers spell this customer’s name more than one way: “Enviromena Project Management UK Limited” (5 sites), “Enviromena project management uk ltd” (1 site) and “enviromena project management uk ltd” (1 site).

7sites of 1 MW and over
151 MWcapacity
–connected (0 sites)
151 MWaccepted to connect (7 sites)

Capacity by DNO

DNOEditionSitesCapacityConnectedAccepted to connect
UKPNNovember 2026 edition464.8 MW–64.8 MW
NGEDAugust 2026 edition236.3 MW–36.3 MW
SPENSeptember 2026 edition149.9 MW–49.9 MW

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Solar7151 MW–151 MW

Each site is grouped by its first energy source, as the register names it.

Sites

Each site under this name in the DNOs’ latest editions, the largest first.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

SiteDNOGrid supply pointTechnologyStatusMW
Crookedstone Farm PVSPENStrathavenSolarAccepted to connect49.9
Lilley BottomUKPNSundonSolarAccepted to connect30
South carlton farmNGEDWest Burton 132Kv S StnSolarAccepted to connect29
(ANM) Oxborough RoadUKPNWalpoleSolarAccepted to connect25
Enviromena project management uk ltdNGEDTaunton SgpSolarAccepted to connect7.3
Backlane Solar FarmUKPNPelhamSolarAccepted to connect4.9
Land off Old Ferry RoadUKPNKemsleySolarAccepted to connect4.9

Grid supply points

Each grid supply point its sites are at, with the capacity of its own sites there.

Grid supply pointDNOSitesConnectedAccepted to connect
StrathavenSPEN1–49.9 MW
SundonUKPN1–30 MW
West Burton 132Kv S StnNGED1–29 MW
WalpoleUKPN1–25 MW
Taunton SgpNGED1–7.3 MW
KemsleyUKPN1–4.9 MW
PelhamUKPN1–4.9 MW

What changed recently

Changes to its sites found in both editions of each pair, newest first.

UKPN, October 2026 edition to November 2026 edition, for this customer’s sites: 3 sites matched. 1 site couldn’t be matched between the two editions, because its details changed or it appears in only one.

1 site without a match in the other edition
In the November 2026 edition only (1)

Tracking NGED’s register since its August 2026 edition. Changes will show from its next edition.

SPEN, August 2026 edition to September 2026 edition, for this customer’s sites: 1 site matched. Every August site and every September site had a match in the other edition.

  • Crookedstone Farm PVSPEN, May 2026 editionCustomer stated as Enviromena Project Management UK Limited (not stated in the April 2026 edition)
QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my projectSee use cases

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?