Enviromena Project Management UK Limited
Customer named in the DNOs’ registers
In UKPN’s November 2026, NGED’s August 2026 and SPEN’s September 2026 editions
The registers spell this customer’s name more than one way: “Enviromena Project Management UK Limited” (5 sites), “Enviromena project management uk ltd” (1 site) and “enviromena project management uk ltd” (1 site).
Capacity by DNO
Capacity by technology
| Technology | Sites | Capacity | Connected | Accepted to connect |
|---|---|---|---|---|
| Solar | 7 | 151 MW | – | 151 MW |
Each site is grouped by its first energy source, as the register names it.
Sites
Each site under this name in the DNOs’ latest editions, the largest first.
Site, company and substation names are shown as they appear in the registers, including capitalisation.
| Site | DNO | Grid supply point | Technology | Status | MW |
|---|---|---|---|---|---|
| Crookedstone Farm PV | SPEN | Strathaven | Solar | Accepted to connect | 49.9 |
| Lilley Bottom | UKPN | Sundon | Solar | Accepted to connect | 30 |
| South carlton farm | NGED | West Burton 132Kv S Stn | Solar | Accepted to connect | 29 |
| (ANM) Oxborough Road | UKPN | Walpole | Solar | Accepted to connect | 25 |
| Enviromena project management uk ltd | NGED | Taunton Sgp | Solar | Accepted to connect | 7.3 |
| Backlane Solar Farm | UKPN | Pelham | Solar | Accepted to connect | 4.9 |
| Land off Old Ferry Road | UKPN | Kemsley | Solar | Accepted to connect | 4.9 |
Grid supply points
Each grid supply point its sites are at, with the capacity of its own sites there.
| Grid supply point | DNO | Sites | Connected | Accepted to connect |
|---|---|---|---|---|
| Strathaven | SPEN | 1 | – | 49.9 MW |
| Sundon | UKPN | 1 | – | 30 MW |
| West Burton 132Kv S Stn | NGED | 1 | – | 29 MW |
| Walpole | UKPN | 1 | – | 25 MW |
| Taunton Sgp | NGED | 1 | – | 7.3 MW |
| Kemsley | UKPN | 1 | – | 4.9 MW |
| Pelham | UKPN | 1 | – | 4.9 MW |
What changed recently
Changes to its sites found in both editions of each pair, newest first.
UKPN, October 2026 edition to November 2026 edition, for this customer’s sites: 3 sites matched. 1 site couldn’t be matched between the two editions, because its details changed or it appears in only one.
1 site without a match in the other edition
In the November 2026 edition only (1)
- Backlane Solar FarmEastern Power Networks (EPN)Accepted to connect4.9 MW
Tracking NGED’s register since its August 2026 edition. Changes will show from its next edition.
SPEN, August 2026 edition to September 2026 edition, for this customer’s sites: 1 site matched. Every August site and every September site had a match in the other edition.
- Crookedstone Farm PVSPEN, May 2026 editionCustomer stated as Enviromena Project Management UK Limited (not stated in the April 2026 edition)
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?