QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.
Distribution / Sites / Customer

ARISE RENEWABLE ENERGY UK LIMITED

Customer named in the DNOs' registers

In NGED's August 2026 and ENWL's September 2026 editions

The registers spell this customer’s name more than one way: “ARISE RENEWABLE ENERGY UK LIMITED” (2 sites), “Arise renewable energy uk limited” (2 sites) and “Arise renewable energy uk ltd” (1 site).

5sites of 1 MW and over
168 MWcapacity
–connected (0 sites)
168 MWaccepted to connect (5 sites)

Capacity by DNO

DNOEditionSitesCapacityConnectedAccepted to connect
NGEDAugust 2026 edition3110 MW–110 MW
ENWLSeptember 2026 edition257.8 MW–57.8 MW

Capacity by technology

TechnologySitesCapacityConnectedAccepted to connect
Solar3110 MW–110 MW
Wind257.8 MW–57.8 MW

Each site is grouped by its first energy source, as the register names it.

Sites

Each site under this name in the DNOs' latest editions, the largest first.

Site, company and substation names are shown as they appear in the registers, including capitalisation.

SiteDNOGrid supply pointTechnologyStatusMW
Great harmeston solar farmNGEDPembroke Power StationSolarAccepted to connect65
CASTLESTEADS WIND FARMENWLHARKER/HUTTONWindAccepted to connect52.8
Four ashes solarNGEDPenn 132Kv S StnSolarAccepted to connect35
Caegarw farm, bedwen arian solar & bess 10mwNGEDPyle GridSolarAccepted to connect10.2
WHITWORTHENWLPADIHAMWindAccepted to connect5

Grid supply points

Each grid supply point its sites are at, with the capacity of its own sites there.

Grid supply pointDNOSitesConnectedAccepted to connect
Pembroke Power StationNGED1–65 MW
HARKER ENWL SGTS 1 2 3A 4 / HUTTON GSP GROUPENWL1–52.8 MW
Penn 132Kv S StnNGED1–35 MW
Pyle GridNGED1–10.2 MW
PADIHAM GSPENWL1–5 MW

What changed recently

Changes to its sites found in both of two consecutive monthly editions of their DNO's register, the latest first.

NGED: QueueWatch holds one edition of its register so far, the August 2026 edition, so there is nothing to compare yet.

ENWL, May 2026 edition to September 2026 edition, for this customer's sites: 2 sites matched. Every May site and every September site had a match in the other edition.

No change to the status, capacity, technology or customer of its sites in the editions QueueWatch holds.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose