Walpole 400kV Substation
England and Wales, National Grid Electricity Transmission
The queue at this substation
| Project | Customer | Technology | Queued MW | Connection date | Gate | Status |
|---|---|---|---|---|---|---|
| Walpole 1 (Tertiary) | WALPOLE GREEN LIMITED | Storage with solar or wind | 57 | 1 Aug 2025 Past date | Not stated | Scoping |
| Walpole Grid Services Facility | Conrad (Walpole) Limited | Other | 0 | 13 Jul 2026 (0 MW) | Not stated | Consents Approved |
| Norfolk001 | EPL NEWCO1 LIMITED | Storage with solar or wind | 860 | 30 Nov 2031 | Not stated | Scoping |
| Walpole Flexible Generation | FLEXIBLE GENERATION 1 LTD | Thermal (gas, biomass, waste) | 2,000 | 30 Jun 2033 | Not stated | Scoping |
| Sutton Bridge | SUTTON BRIDGE POWER GENERATION | Thermal (gas, biomass, waste) | 0 | Connected | Not stated | Built |
Recent changes
- Walpole Grid Services FacilityEngland and Wales, OtherConnection date moved from 30 May 2025 to 13 Jul 2026 (+13 months)+13 mo
- Walpole 1 (Tertiary)England and Wales, Storage with solar or windConnection date moved from 15 Jul 2025 to 1 Aug 2025 (+1 month)+1 mo
- Norfolk001England and Wales, Storage with solar or windCustomer changed from EVOLUTION POWER LIMITED to EPL NEWCO1 LIMITED
- Walpole 1 (Tertiary)England and Wales, Storage with solar or windStage removed (7.1 MW from 31 Oct 2023)
- Walpole 1 (Tertiary)England and Wales, Storage with solar or windStage 1: Capacity changed from 49.9 MW to 57 MW
- Walpole 1 (Tertiary)England and Wales, Storage with solar or windStage 1: Connection date moved from 1 May 2023 to 15 Jul 2025 (+26 months)+26 mo
- Walpole Grid Services FacilityEngland and Wales, OtherConnection date moved from 31 May 2025 to 30 May 2025 (1 day earlier)
- Walpole Grid Services FacilityEngland and Wales, OtherStatus changed from Awaiting Consents to Consents Approved
- Walpole Flexible GenerationEngland and Wales, Thermal (gas, biomass, waste)Added to the registerNew
- Walpole Grid Services FacilityEngland and Wales, OtherAdded to the registerNew
- Norfolk001England and Wales, Storage with solar or windAdded to the registerNew
- Walpole 1 (Tertiary)England and Wales, Storage with solar or windSubstation name updated in the register (from Walpole 400kV to Walpole 400kV Substation)
- Walpole 1 (Tertiary)England and Wales, Storage with solar or windStage 1: Connection date moved from 5 Jan 2023 to 1 May 2023 (+4 months)+4 mo
Price what a delay would do to your project
QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?