Projects / England and Wales
- Connection date
- 30 Nov 2031
- Gate
- Not stated
- Status
- Scoping
- Technology
- Storage + Solar
- Total capacity
- 860 MW
- Connected now
- 0 MW
- Still to connect
- 860 MW
- Transmission owner
- National Grid Electricity Transmission (NGET)
- Agreement type
- Direct Connection
- Region
- England and Wales
- Project number
- PRO-001996
- Tracked since
- 14 Aug 2026
Change history
Every change to this project across 9 registers from 14 Aug 2026 to 21 Sep 2026.
No changes since 14 Aug 2026. Follow this project to see the next one on your watchlist.
Also queued at Walpole 400kV Substation
Substation view4 other projects, 2.9 GW still to connect at this substation in total.
- Walpole 1 (Tertiary)WALPOLE GREEN LIMITED, Storage with solar or wind, Not statedAug 202557 MW
- Walpole Grid Services FacilityConrad (Walpole) Limited, Other, Not statedJul 20260 MW
- Walpole Flexible GenerationFLEXIBLE GENERATION 1 LTD, Thermal (gas, biomass, waste), Not statedJun 20332 GW
- Sutton BridgeSUTTON BRIDGE POWER GENERATION, Thermal (gas, biomass, waste), Not statedConnected850 MW