Dungeness 400kV Substation
England and Wales, National Grid Electricity Transmission
The queue at this substation
| Project | Customer | Technology | Queued MW | Connection date | Gate | Status |
|---|---|---|---|---|---|---|
| BLUE PLANET SOLAR | BLUE PLANET SOLAR LIMITED | Storage with solar or wind | 500 | 31 Aug 2031 | Not stated | Scoping |
| Dungeness Energy Park | SOUTH KENT ENERGY PARK LIMITED | Storage with solar or wind | 500 | 31 Oct 2037 | Gate 1 | Scoping |
Recent changes
- Dungeness Energy ParkEngland and Wales, Storage with solar or windMarked as Gate 1
- Dungeness Energy ParkEngland and Wales, Storage with solar or windConnection point changed from East Kent connection node A 400kV Substation to Dungeness 400kV Substation
- BLUE PLANET SOLAREngland and Wales, Storage with solar or windConnection date moved from 31 Oct 2029 to 31 Aug 2031 (+22 months)+22 mo
- Dungeness Energy ParkEngland and Wales, Storage with solar or windCustomer changed from LOW CARBON SOLAR PARK 14 LIMITED to SOUTH KENT ENERGY PARK LIMITED
- Dungeness Energy ParkEngland and Wales, Storage with solar or windRestructured from 2 stages (500 MW from 31 Dec 2030, 0 MW from 31 Dec 2037) to 1 stage (500 MW from 31 Oct 2037). First connection date +82 months+82 mo
- Dungeness Energy ParkEngland and Wales, Storage with solar or windRestructured from 1 stage (500 MW from 31 Oct 2031) to 2 stages (500 MW from 31 Dec 2030, 0 MW from 31 Dec 2037). First connection date −10 months−10 mo
- Dungeness Energy ParkEngland and Wales, Storage with solar or windConnection point changed from Dungeness 400kV Substation to Newchurch 400kV Substation
- Dungeness Energy ParkEngland and Wales, Storage with solar or windConnection date moved from 1 Apr 2029 to 31 Oct 2031 (+31 months)+31 mo
- BLUE PLANET SOLAREngland and Wales, Storage with solar or windSubstation name updated in the register (from Dungeness 400KV to Dungeness 400kV Substation)
- Dungeness Energy ParkEngland and Wales, Storage with solar or windSubstation name updated in the register (from Dungeness 400KV to Dungeness 400kV Substation)
- Dungeness Energy ParkEngland and Wales, Storage with solar or windAdded to the registerNew
- BLUE PLANET SOLAREngland and Wales, Storage with solar or windAdded to the registerNew
Price what a delay would do to your project
QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?