Delays and exits in the transmission queue since 2021How often connection dates move, and how many projects leave the queue. Gate 2 in the transmission queueHow much of the queue has a Gate 2 offer, and what it did to connection dates. The battery queue and CMP470’s commitment feeHow far the battery queue sits above the line that would switch CMP470’s commitment fee off. Changes of customer in the transmission queueHow often connection agreements move between companies, and how those projects fared. Do projects connect on time?How late stages have connected against their connection date in the register. Which connection dates slip least?Which connection dates are pushed back least, allowing for how far ahead they are. Grid outages and the connections due by 2030How many of their planned outages the transmission owners carry out, against the connections due by 2030.

More analyses are on the way.

Transmission / Projects / Substation

Drakelow 132kV Substation

England and Wales, National Grid Electricity Transmission

3projects in the register
372 MWstill to connect
252 MWof that with Gate 2 offers
0 MWconnected now

The queue at this substation

ProjectCustomerTechnologyQueued MWConnection dateGateStatus
Oaklands Farm Solar PVOAKLANDS FARM SOLAR LIMITED.Storage with solar or wind16230 Jun 2027Gate 2Consents Approved
DrakelowENSO GREEN HOLDINGS V LIMITEDStorage1201 Dec 2027Gate 1Scoping
Royle Farm BESSALUDRA BESS LTDStorage9031 Oct 2028 +12 moGate 2Consents Approved

Recent changes

  • Oaklands Farm Solar PVEngland and Wales, Storage with solar or windStatus changed from Scoping to Consents Approved
  • Oaklands Farm Solar PVEngland and Wales, Storage with solar or windGiven a Gate 2 connection offerGate 2
  • Royle Farm BESSEngland and Wales, StorageStatus changed from Scoping to Consents Approved
  • Royle Farm BESSEngland and Wales, StorageConnection date moved from 31 Oct 2027 to 31 Oct 2028 (+12 months)+12 mo
  • Royle Farm BESSEngland and Wales, StorageGiven a Gate 2 connection offerGate 2
  • DrakelowEngland and Wales, StorageMarked as Gate 1
  • Oaklands Farm Solar PVEngland and Wales, Storage with solar or windConnection date moved from 1 Jun 2025 to 30 Jun 2027 (+25 months)+25 mo
  • Oaklands Farm Solar PVEngland and Wales, Storage with solar or windCustomer changed from BAYWA R.E. UK LIMITED to OAKLANDS FARM SOLAR LIMITED.
  • Royle Farm BESSEngland and Wales, StorageAdded to the registerNew
  • DrakelowEngland and Wales, StorageCustomer changed from ENSO GREEN HOLDINGS LIMITED to ENSO GREEN HOLDINGS V LIMITED
  • DrakelowEngland and Wales, StorageCustomer changed from ENSO Green Holdings V Limited to ENSO GREEN HOLDINGS LIMITED
  • DrakelowEngland and Wales, StorageConnection point changed from Drakelow 400kV Substation to Drakelow 132kV Substation
  • DrakelowEngland and Wales, StorageTechnology changed from Storage, Solar to Storage
  • DrakelowEngland and Wales, StorageCapacity changed from 57 MW to 120 MW
  • DrakelowEngland and Wales, StorageConnection date moved from 31 Oct 2024 to 1 Dec 2027 (+37 months)+37 mo
  • DrakelowEngland and Wales, StorageCustomer changed from ENSO GREEN HOLDINGS LIMITED to ENSO Green Holdings V Limited
  • Oaklands Farm Solar PVEngland and Wales, Storage with solar or windSubstation name updated in the register (from Drakelow 132kV to Drakelow 132kV Substation)
  • Oaklands Farm Solar PVEngland and Wales, Storage with solar or windTechnology changed from Solar to Storage, Solar
  • DrakelowEngland and Wales, StorageSubstation name updated in the register (from Drakelow 400kV to Drakelow 400kV Substation)
  • Oaklands Farm Solar PVEngland and Wales, Storage with solar or windCapacity changed from 79.6 MW to 162 MW
  • Oaklands Farm Solar PVEngland and Wales, Storage with solar or windConnection date moved from 1 Oct 2023 to 1 Jun 2025 (+20 months)+20 mo
  • Oaklands Farm Solar PVEngland and Wales, Storage with solar or windConnection date moved from 10 Jan 2023 to 1 Oct 2023 (+9 months)+9 mo
QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my projectSee use cases

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Status definitions (NESO)

Scoping: NESO is not aware that a planning application has been made.

Awaiting Consents: NESO is aware, or the customer has told it, that a planning application has been made.

Consents Approved: NESO is aware, or the customer has told it, that the planning application has been approved.

Terminated: used by NESO only in its register of 30 April 2021, for two projects that left the register the next month.

These statuses are NESO’s, not QueueWatch’s, and NESO describes them as “as far as we are aware”, so a project may be further along than its status shows.

Source: NESO