Devonside 132/33kV
South Scotland, SP Energy Networks
The queue at this substation
| Project | Customer | Technology | Queued MW | Connection date | Gate | Status |
|---|---|---|---|---|---|---|
| Devonside BESS | CARLTON POWER LIMITED | Storage | 49.5 | 18 Aug 2028 | Not stated | Scoping |
| Bankhead 25MW BESS | GPC 1169 Ltd | Storage | 25 | 30 Apr 2030 | Not stated | Scoping |
| Longriggs Energy Park | BROCKWELL STORAGE & SOLAR LIMITED | Storage | 60 | 30 Apr 2039 | Not stated | Awaiting Consents |
Recent changes
- Longriggs Energy ParkSouth Scotland, StorageAdded to the registerNew
- Bankhead 25MW BESSSouth Scotland, StorageSubstation name updated in the register (from Devonside GSP to Devonside 132/33kV)
- Devonside BESSSouth Scotland, StorageSubstation name updated in the register (from Devonside GSP to Devonside 132/33kV)
- Bankhead 25MW BESSSouth Scotland, StorageAdded to the registerNew
- Devonside BESSSouth Scotland, StorageConnection point changed from Ochill 132kV Substation to Devonside GSP
- Devonside BESSSouth Scotland, StorageConnection point changed from Devonside GSP to Ochill 132kV Substation
- Devonside BESSSouth Scotland, StorageAdded to the registerNew
Price what a delay would do to your project
QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?