Derbyshire Connection Node B 400kV Substation
England and Wales, National Grid Electricity Transmission
The queue at this substation
| Project | Customer | Technology | Queued MW | Connection date | Gate | Status |
|---|---|---|---|---|---|---|
| Camp Farm | CHINT SOLAR UK MANAGEMENT LTD | Storage | 250 | 30 Oct 2037 | Gate 1 | Scoping |
| Lightsource Enderby PV+BESS | Lightsource Renewable UK Development Limited | Storage with solar or wind | 240 | 30 Oct 2037 | Gate 1 | Scoping |
| Lower Pool Energy Park | Renewable Energy Systems Limited | Storage with solar or wind | 600 | 30 Oct 2037 +84 mo | Gate 1 | Scoping |
Recent changes
- Lower Pool Energy ParkEngland and Wales, Storage with solar or windCustomer changed from Cairn Duhie Energy Limited to Renewable Energy Systems Limited
- Lightsource Enderby PV+BESSEngland and Wales, Storage with solar or windConnection date moved from 31 Oct 2037 to 30 Oct 2037 (1 day earlier)
- Lightsource Enderby PV+BESSEngland and Wales, Storage with solar or windMarked as Gate 1
- Lower Pool Energy ParkEngland and Wales, Storage with solar or windCustomer changed from Renewable Energy Systems Limited to CAIRN DUHIE ENERGY LIMITED
- Lower Pool Energy ParkEngland and Wales, Storage with solar or windConnection date moved from 31 Oct 2030 to 30 Oct 2037 (+84 months)+84 mo
- Camp FarmEngland and Wales, StorageMarked as Gate 1
- Camp FarmEngland and Wales, StorageConnection point changed from Coventry 275kV Substation to Derbyshire Connection Node B 400kV Substation
- Lower Pool Energy ParkEngland and Wales, Storage with solar or windMarked as Gate 1
- Lower Pool Energy ParkEngland and Wales, Storage with solar or windCustomer changed from Cairn Duhie Energy Limited to Renewable Energy Systems Limited
- Lower Pool Energy ParkEngland and Wales, Storage with solar or windCustomer changed from Renewable Energy Systems Limited to Cairn Duhie Energy Limited
- Camp FarmEngland and Wales, StorageAdded to the registerNew
- Lower Pool Energy ParkEngland and Wales, Storage with solar or windConnection point changed from Earl Shilton 400kV Substation to Derbyshire Connection Node B 400kV Substation
- Lightsource Enderby PV+BESSEngland and Wales, Storage with solar or windConnection point changed from Enderby 400kV Substation to Derbyshire Connection Node B 400kV Substation
- Lightsource Enderby PV+BESSEngland and Wales, Storage with solar or windConnection date moved from 31 Oct 2034 to 31 Oct 2037 (+36 months)+36 mo
- Lower Pool Energy ParkEngland and Wales, Storage with solar or windConnection point changed from Earl Shilton 275kV to Earl Shilton 400kV Substation
- Lightsource Enderby PV+BESSEngland and Wales, Storage with solar or windAdded to the registerNew
- Lower Pool Energy ParkEngland and Wales, Storage with solar or windAdded to the registerNew
Price what a delay would do to your project
QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?