Blacklaw 132/33kV
South Scotland, SP Energy Networks
The queue at this substation
| Project | Customer | Technology | Queued MW | Connection date | Gate | Status |
|---|---|---|---|---|---|---|
| Blacklaw | Scottish Power Renewables (UK) Limited | Storage with solar or wind | 222 | 8 Oct 2032 | Not stated | Scoping |
Recent changes
- BlacklawSouth Scotland, Storage with solar or windStage 1: Technology changed from Onshore wind to Storage, Onshore wind
- BlacklawSouth Scotland, Storage with solar or windStage 2: Connection date moved from 15 Jun 2029 to 8 Oct 2032 (+40 months)+40 mo
- BlacklawSouth Scotland, Storage with solar or windStage 2: Technology changed from Onshore wind to Storage, Onshore wind
- BlacklawSouth Scotland, Storage with solar or windConnection point changed from Blacklaw Wind Farm Substation to Blacklaw 132/33kV
- BlacklawSouth Scotland, Storage with solar or windRestructured from 2 stages (222 MW from 15 Jun 2029, 118 MW connected) to 2 stages (222 MW from 15 Jun 2029, 118 MW connected)
- BlacklawSouth Scotland, Storage with solar or windSubstation name updated in the register (from Blacklaw Wind Farm to Blacklaw Wind Farm Substation)
- BlacklawSouth Scotland, Storage with solar or windNew stage added (222 MW from 15 Jun 2029)
Price what a delay would do to your project
QueueWatch reports what changed in the public TEC register. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?