- Connection date
- 31 Oct 2028
- Gate
- Gate 2
- Status
- Consented
- Technology
- Storage
- Total capacity
- 400 MW
- Connected now
- 0 MW
- Still to connect
- 400 MW
- Transmission owner
- National Grid Electricity Transmission (NGET)
- Agreement type
- Direct Connection
- Region
- England and Wales
- Project number
- PRO-001598
- Tracked since
- 14 Aug 2026
Change history
Every change to this project across 9 registers from 14 Aug 2026 to 21 Sep 2026.
No changes since 14 Aug 2026. Follow this project to see the next one on your watchlist.
4 other projects, 3.5 GW still to connect at this substation in total.
- BESS North FarmREWE 5 LIMITED, Storage, Gate 1Nov 2031150 MW
- ChickerellENSO GREEN HOLDINGS X LIMITED, Storage with solar or wind, Gate 1Dec 2036400 MW
- PortwindSE PORTWIND LTD, Offshore wind, Gate 1Dec 20362.5 GW
- ChickerellSSE GENERATION LIMITED, Thermal (gas, biomass, waste), Not statedConnected47 MW