Whittington Hospital
Whittington Hospital at Islington
UKPN Embedded Capacity Register 2 – 1MW and above, October 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 22 Nov 2015
- Status
- Connected
- Customer
- Whittington Hospital
- Site name
- Whittington Hospital
- Address
- Magdala Avenue, Highgate Hill, London, N19 5NF
- Grid reference
- Easting 529061, northing 186940
- Licence area
- London Power Networks (LPN)
- Grid supply point
- Islington
- Bulk supply point
- Holloway Grid 66kV
- Primary substation
- Hatchard Rd 11kV
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Oil, Engine (combustion / reciprocating): 3 MW registered
- Registered capacity
- 3 MW
- Maximum export capacity
- 3 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- No
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not published by UKPN
- Export MPAN
- 1200010095010
- Import MPAN
- Not stated
- Last updated
- 14 Dec 2021
- Tracked since
- September 2026 edition
Change history
Tracked since the September 2026 edition, across 2 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at Islington
GSP view3 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 8.8 MW: 8.8 MW connected.
- Francis Crick InstituteFrancis Crick Institute, Gas and other fossil, Georgiana St 11kV primaryConnected2 MW
- Viacom InternationalViacom International, Gas and other fossil, Georgiana St 11kV primaryConnected1 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose