Emirates Stadium
Impact Power Limited at Islington
UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 21 Nov 2018
- Status
- Connected
- Customer
- Impact Power Limited
- Site name
- Emirates Stadium
- Address
- Emirates Stadium, Hornsey Road, Hornsey, London, N7 7AJ
- Grid reference
- Easting 531235, northing 185629
- Licence area
- London Power Networks (LPN)
- Grid supply point
- Islington
- Bulk supply point
- Not stated
- Primary substation
- Holloway 11kV
- Connection voltage
- 11 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 2.8 MW registered
- Registered capacity
- 2.8 MW
- Maximum export capacity
- 2.8 MW
- Maximum import capacity
- 0 MW
- Flexible connection
- No
- In a connection queue
- No
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1200062401665
- Import MPAN
- Not stated
- Last updated
- 14 Dec 2021
- Tracked since
- September 2026 edition
What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?
Change history
Tracked since the September 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Islington
GSP view2 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 6.8 MW: 6.8 MW connected.
- Whittington HospitalWhittington Hospital, Gas and other fossil, Hatchard Rd 11kV primaryConnected3 MW
- Viacom InternationalViacom International, Gas and other fossil, Georgiana St 11kV primaryConnected1 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?