Westcott Venture Solar Park
BNP Paribas Depositary Services (Jersey) at Sundon
UKPN Embedded Capacity Register 2 – 1MW and above, October 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 8 Apr 2026
- Status
- Connected
- Customer
- BNP Paribas Depositary Services (Jersey)
- Site name
- Westcott Venture Solar Park
- Address
- Ashendon Road, Westcott, Aylesbury, Hertfordshire, HP18 0NX
- Grid reference
- Easting 471490, northing 217630
- Licence area
- Eastern Power Networks (EPN)
- Grid supply point
- Sundon
- Bulk supply point
- Aylesbury East Grid 33kV
- Primary substation
- Waddesdon Primary 11kV
- Connection voltage
- 33 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 8 MW registered
- Registered capacity
- 8 MW
- Maximum export capacity
- 8 MW
- Maximum import capacity
- 2.37 MW
- Flexible connection
- No
- In a connection queue
- No
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not published by UKPN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 16 Apr 2026
- Tracked since
- September 2026 edition
Change history
Tracked since the September 2026 edition, across 2 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at Sundon
GSP view69 other sites at this grid supply point in the October 2026 edition, 3 of them at Waddesdon Primary 11kV, the same primary substation. In all, the sites here total 1.1 GW: 0.5 GW connected, 0.6 GW accepted to connect.
- Westcott Venture ParkShanks Waste Management Limited, Bioenergy and waste, Waddesdon Primary 11kV primaryConnected3 MW
- Westcott Venture Park, Phase 2A and Phase 2BShanks Waste Management Limited, Solar, Waddesdon Primary 11kV primaryConnected1.1 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose