QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Tillingdown Farm

Ylem BESS (South) Limited at Beddington 132kV

UKPN Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
10 Jan 2026
Status
Accepted to connect
Customer
Ylem BESS (South) Limited
Site name
Tillingdown Farm
Address
Tillingdown Lane, Caterham, Surrey, CR3 7JA
Grid reference
Easting 534878, northing 155515
Licence area
South Eastern Power Networks (SPN)
Grid supply point
Beddington 132kV
Bulk supply point
Purley Grid 33kV
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Storage
Energy source 1
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 12 MW registered
Registered capacity
12 MW
Change to maximum export capacity
12 MW
Change to maximum import capacity
12 MW
Flexible connection
No
In a connection queue
Yes
Date accepted
20 Apr 2022
Date connected
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not published by UKPN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
14 Jun 2024
Tracked since
September 2026 edition

Change history

Tracked since the September 2026 edition, across 2 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Beddington 132kV

GSP view

10 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 118 MW: 106 MW connected, 12 MW accepted to connect.

See all 10

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose