Rolls Royce Power
Croydon Energy at Beddington 132kV
UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 12 Jan 2002
- Status
- Connected
- Customer
- Croydon Energy
- Site name
- Rolls Royce Power
- Address
- Factory Lane, Croydon, Surrey, CR0 3RL
- Grid reference
- Easting 531449, northing 165923
- Licence area
- South Eastern Power Networks (SPN)
- Grid supply point
- Beddington 132kV
- Bulk supply point
- Not stated
- Primary substation
- Not stated
- Connection voltage
- 132 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Gas, Gas turbine (OCGT): 58 MW registered
- Registered capacity
- 58 MW
- Maximum export capacity
- 58 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- No
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1900060831708
- Import MPAN
- 1900060831692
- Last updated
- 15 Jan 2024
- Tracked since
- September 2026 edition
Change history
Tracked since the September 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Beddington 132kV
GSP view10 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 118 MW: 106 MW connected, 12 MW accepted to connect.
- Viridor Waste Management, Beddington Farm Landfill SiteViridor Waste Management Limited, Bioenergy and waste, Beddington 11kV primaryConnected7 MW
- Cheam WTW 213936Sutton and East Surrey Water plc, Gas and other fossil, Sutton B 11kV primaryConnected4.42 MW
- Biggin Hill Airport (Kite Shed)Zestec Asset Management Limited, Solar, Addington Grid 11kV primaryConnected1.1 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?