Strasbourg Street
Westwood Power at Richborough/Sellindge 132kV
UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 8 Dec 2020
- Status
- Connected
- Customer
- Westwood Power
- Site name
- Strasbourg Street
- Address
- Strasbourg Street, Margate, Kent, CT9 4JF
- Grid reference
- Easting 635973, northing 168788
- Licence area
- South Eastern Power Networks (SPN)
- Grid supply point
- Richborough/Sellindge 132kV
- Bulk supply point
- Thanet Grid 33kV
- Primary substation
- Not stated
- Connection voltage
- 33 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Gas, Engine (combustion / reciprocating): 21.05 MW registered
- Registered capacity
- 21.05 MW
- Maximum export capacity
- 21.05 MW
- Maximum import capacity
- Not stated
- Flexible connection
- Yes
- In a connection queue
- No
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1900091919597
- Import MPAN
- 1900091919588
- Last updated
- 14 Mar 2023
- Tracked since
- September 2026 edition
Change history
Tracked since the September 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Richborough/Sellindge 132kV
GSP view29 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 640 MW: 540 MW connected, 100 MW accepted to connect.
- Sevington GenerationUK Power Reserve Limited, Gas and other fossil, Sevington 11kV primaryConnected10 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?