QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Sevington Generation

UK Power Reserve Limited at Richborough/Sellindge 132kV

UKPN Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
6 Jun 2002
Status
Connected
Customer
UK Power Reserve Limited
Site name
Sevington Generation
Address
The Long Barrow, Orbital Park, Ashford, Kent, TN24 0GP
Grid reference
Easting 602352, northing 140548
Licence area
South Eastern Power Networks (SPN)
Grid supply point
Richborough/Sellindge 132kV
Bulk supply point
Ashford Grid 33kV
Primary substation
Sevington 11kV
Connection voltage
11 kV
Technology group
Gas and other fossil
Energy source 1
Fossil - Gas, Gas turbine (OCGT): 10 MW registered
Registered capacity
10 MW
Maximum export capacity
10 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
No
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not published by UKPN
Export MPAN
1900091173770
Import MPAN
Not stated
Last updated
13 Nov 2020
Tracked since
September 2026 edition

Change history

Tracked since the September 2026 edition, across 2 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Richborough/Sellindge 132kV

GSP view

29 other sites at this grid supply point in the October 2026 edition, 1 of them at Sevington 11kV, the same primary substation. In all, the sites here total 639 MW: 539 MW connected, 100 MW accepted to connect.

  • Long BarrowUK Power Reserve Limited, Gas and other fossil, Sevington 11kV primaryConnected4.6 MW
  • Thanet WindfarmNational Grid Electricity Transmission PLC, WindConnected315 MW
  • Manor FarmAura Power Solar UK Limited, SolarAccepted99.9 MW
  • Thanet EnergyThanet Energy Limited, Gas and other fossilConnected30 MW
  • Strasbourg StreetWestwood Power, Gas and other fossilConnected21.05 MW
  • Sycamore FarmElectricity Solutions Limited, SolarConnected18 MW
  • Alkane SitePark Energy Limited, Gas and other fossilConnected15.4 MW
  • Ash GenerationAPS Salads Limited, Gas and other fossilConnected15 MW

See all 29

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose