QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Royal Marsden Hospital

Ameresco at St Johns Wood

UKPN Embedded Capacity Register 2 – 1MW and above, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
17 Dec 2021
Status
Connected
Customer
Ameresco
Site name
Royal Marsden Hospital
Address
Fulham Road, Chelsea, London, SW3 6JJ
Grid reference
Easting 526951, northing 178463
Licence area
London Power Networks (LPN)
Grid supply point
St Johns Wood
Bulk supply point
Not stated
Primary substation
Old Brompton Rd B 11kV
Connection voltage
11 kV
Technology group
Gas and other fossil
Energy source 1
Fossil - Gas, Engine (combustion / reciprocating): 0.999 MW registered
Registered capacity
1 MW
Maximum export capacity
1 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
No
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not published by UKPN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
14 Nov 2023
Tracked since
September 2026 edition

Change history

Found in the September 2026 edition only.

Changes to the details QueueWatch tracks, newest first.

  • October 2026 edition
    Not found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode

No changes to show: it has been found in one edition.

Also at St Johns Wood

GSP view

7 other sites at this grid supply point in the November 2026 edition, 1 of them at Old Brompton Rd B 11kV, the same primary substation. In all, the sites here total 20.2 MW: 18.2 MW connected, 2 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?