Pimlico District Heating, The Pump House

Pimlico District Heating, The Pump House at St Johns Wood

UKPN Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
30 Jun 2006
Status
Connected
Customer
Pimlico District Heating, The Pump House
Site name
Pimlico District Heating, The Pump House
Address
Churchill Gardens Road, Pimlico, London, SW1V 3JF
Grid reference
Easting 529232, northing 177938
Licence area
London Power Networks (LPN)
Grid supply point
St Johns Wood
Bulk supply point
Not stated
Primary substation
Ebury Bridge 11kV
Connection voltage
11 kV
Technology group
Gas and other fossil
Energy source 1
Fossil - Gas, Steam-gas turbine (CCGT): 2.48 MW registered
Registered capacity
2.48 MW
Maximum export capacity
2.48 MW
Maximum import capacity
Not stated
Flexible connection
No
In a connection queue
No
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not published by UKPN
Export MPAN
1200052312539
Import MPAN
Not stated
Last updated
13 Nov 2020
Tracked since
September 2026 edition

Change history

Tracked since the September 2026 edition, across 2 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at St Johns Wood

GSP view

8 other sites at this grid supply point in the October 2026 edition, 1 of them at Ebury Bridge 11kV, the same primary substation. In all, the sites here total 23.8 MW: 21.8 MW connected, 2 MW accepted to connect.

  • Harrods KnightsbridgeHarrods, Gas and other fossil, Ebury Bridge 11kV primaryConnected2.6 MW
  • Imperial CollegeImperial College, Gas and other fossil, Duke St B 11kV primaryConnected8.75 MW
  • University College LondonUniversity College London, Gas and other fossil, Longford St B 11kV primaryConnected2.92 MW
  • 21 MoorfieldBells Power Solutions, Gas and other fossil, Back Hill A 11kV primaryAccepted2 MW
  • Marks & SpencersMarks & Spencers, Gas and other fossil, Duke St B 11kV primaryConnected1.6 MW
  • Mayfair Telephone ExchangeMayfair Telephone Exchange, Gas and other fossil, Duke St B 11kV primaryConnected1.2 MW
  • Royal Marsden HospitalRoyal Marsden Hospital, Gas and other fossil, Old Brompton Rd B 11kV primaryConnected1.2 MW
  • Royal Marsden HospitalAmeresco, Gas and other fossil, Old Brompton Rd B 11kV primaryConnected1 MW
QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose