Park Farm
Ecoenergy Renewable Energy Limited at Sellindge
UKPN Embedded Capacity Register 2 – 1MW and above, October 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 31 Oct 2031
- Status
- Accepted to connect
- Customer
- Ecoenergy Renewable Energy Limited
- Site name
- Park Farm
- Address
- Pound Lane, Ashford, Kent, TN25 6RG
- Grid reference
- Easting 609613, northing 140590
- Licence area
- South Eastern Power Networks (SPN)
- Grid supply point
- Sellindge
- Bulk supply point
- Sellindge Grid
- Primary substation
- Sellindge Local 33kV
- Connection voltage
- 33 kV
- Technology group
- Solar
- Energy source 1
- Solar, Photovoltaic: 49.9 MW registered
- Energy source 2
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 49.9 MW registered
- Registered capacity
- 49.9 MW
- Change to maximum export capacity
- 49.9 MW
- Change to maximum import capacity
- 20 MW
- Flexible connection
- Yes
- In a connection queue
- Yes
- Date accepted
- 18 Mar 2021
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not published by UKPN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 15 Apr 2024
- Tracked since
- September 2026 edition
Change history
Tracked since the September 2026 edition, across 2 editions.
Changes to its status, capacity, technology or customer, newest first.
No change to its status, capacity, technology or customer.
Also at Sellindge
GSP view5 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 264 MW: 264 MW accepted to connect.
- Thornton RoadPathfinder Clean Energy (PACE) UKDEV Limited, Solar, Sellindge 132kV primaryAccepted48.1 MW
- St.Marys RoadSt Mary In The Marsh Renewable Energy Limited, Solar, Ruckinge Grid 33kV primaryAccepted16 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose