Eastry Solar Farm

Padero Solaer Limited at Sellindge

UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not stated
Status
Accepted to connect
Customer
Padero Solaer Limited
Site name
Eastry Solar Farm
Address
Sandwich Road (Lan On The South Side), Sandwich, Kent, CT13 0LY
Grid reference
Easting 631627, northing 157274
Licence area
South Eastern Power Networks (SPN)
Grid supply point
Sellindge
Bulk supply point
Betteshanger
Primary substation
Betteshanger
Connection voltage
33 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 15.306 MW registered
Registered capacity
15.31 MW
Change to maximum export capacity
15.31 MW
Change to maximum import capacity
0.15 MW
Flexible connection
Yes
In a connection queue
Yes
Date accepted
18 Sep 2025
Date connected
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
14 Oct 2025
Tracked since
September 2026 edition

Change history

Tracked since the September 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Sellindge

GSP view

5 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 264 MW: 264 MW accepted to connect.

  • Bank Farm SolarSkyfall Energy Limited, StorageAccepted99.9 MW
  • Park FarmEcoenergy Renewable Energy Limited, Solar, Sellindge Local 33kV primaryAccepted49.9 MW
  • Thornton RoadPathfinder Clean Energy (PACE) UKDEV Limited, Solar, Sellindge 132kV primaryAccepted48.1 MW
  • Appledore RoadQc Cronan Limited, SolarAccepted35 MW
  • St.Marys RoadSt Mary In The Marsh Renewable Energy Limited, Solar, Ruckinge Grid 33kV primaryAccepted16 MW
QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?