Owls Hatch Road
Ylem BESS (South) Limited at Canterbury
UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not stated
- Status
- Accepted to connect
- Planning consent
- Granted 3 Jul 2025
Canterbury, reference CA/24/02262 · Source: REPD - Customer
- Ylem BESS (South) Limited
- Site name
- Owls Hatch Road
- Address
- Owls Hatch Road, Herne Bay, Kent, CT6 7DZ
- Grid reference
- Easting 615601, northing 166081
- Licence area
- South Eastern Power Networks (SPN)
- Grid supply point
- Canterbury
- Bulk supply point
- Not stated
- Primary substation
- Canterbury North 132kV
- Connection voltage
- 132 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 50 MW registered
- Registered capacity
- 50 MW
- Change to maximum export capacity
- 50 MW
- Change to maximum import capacity
- 50 MW
- Flexible connection
- Yes
- In a connection queue
- Yes
- Date accepted
- 12 Aug 2023
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 15 Apr 2024
- Tracked since
- September 2026 edition
What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?
Change history
Tracked since the September 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Canterbury
GSP view16 other sites at this grid supply point in the November 2026 edition, 2 of them at Canterbury North 132kV, the same primary substation. In all, the sites here total 454 MW: 294 MW connected, 160 MW accepted to connect.
- Britton Court FarmBritton Court Energy Centre Limited, Solar, Canterbury North 132kV primaryAccepted40 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?
Planning consent
The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.
How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.