QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Allington Generation

Kent Enviropower at Canterbury

UKPN Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
27 Oct 2005
Status
Connected
Customer
Kent Enviropower
Site name
Allington Generation
Address
Laverstoke Road, Maidstone, Kent, ME16 0LE
Grid reference
Easting 573938, northing 157786
Licence area
South Eastern Power Networks (SPN)
Grid supply point
Canterbury
Bulk supply point
Maidstone Grid 33kV
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Bioenergy and waste
Energy source 1
Waste, Steam turbine (thermal power plant): 40 MW registered
Registered capacity
40 MW
Maximum export capacity
40 MW
Maximum import capacity
32.3 MW
Flexible connection
No
In a connection queue
No
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not published by UKPN
Export MPAN
1900070394466
Import MPAN
Not stated
Last updated
14 Dec 2022
Tracked since
September 2026 edition

Change history

Tracked since the September 2026 edition, across 2 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Canterbury

GSP view

16 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 454 MW: 294 MW connected, 160 MW accepted to connect.

See all 16

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose