Monarch Pier
Disco Powered Limited at Littlebrook 132kV (LPN)
UKPN Embedded Capacity Register 2 – 1MW and above, October 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not stated
- Status
- Accepted to connect
- Customer
- Disco Powered Limited
- Site name
- Monarch Pier
- Address
- Chandlers Drive, Erith, Kent, DA8 1LN
- Grid reference
- Easting 551046, northing 178629
- Licence area
- London Power Networks (LPN)
- Grid supply point
- Littlebrook 132kV (LPN)
- Bulk supply point
- Dartford Grid A 33kV
- Primary substation
- Erith 11kV
- Connection voltage
- 11 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 1.5 MW registered
- Registered capacity
- 1.5 MW
- Change to maximum export capacity
- 1.5 MW
- Change to maximum import capacity
- 1.5 MW
- Flexible connection
- No
- In a connection queue
- Yes
- Date accepted
- 11 Aug 2021
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not published by UKPN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 14 Feb 2025
- Tracked since
- September 2026 edition
What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?
Change history
Tracked from the September 2026 edition to the October 2026 edition, across 2 editions.
Changes to the details QueueWatch tracks, newest first.
- November 2026 editionNot found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode
No change to any detail QueueWatch tracks.
Also at Littlebrook 132kV (LPN)
GSP view4 other sites at this grid supply point in the November 2026 edition, 1 of them at Erith 11kV, the same primary substation. In all, the sites here total 106 MW: 17 MW connected, 89 MW accepted to connect.
- Erith Oil Works, Albion WharfErith Oil Works, Albion Wharf, Gas and other fossil, Erith 11kV primaryConnected14.8 MW
- Darent Valley HospitalDarent Valley Hospital, Gas and other fossil, Dartford Grid B 11kV primaryConnected1.4 MW
- Sandpit Road Maxmor HouseSandpit Road Maxmor House, Solar, Dartford Grid B 11kV primaryConnected1.1 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?