QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Riverside Energy Park

Cory Riverside Energy at Littlebrook 132kV (LPN)

UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
14 Apr 2026
Status
Accepted to connect
Customer
Cory Riverside Energy
Site name
Riverside Energy Park
Address
Norman Road, Belvedere, Kent, DA17 6JY
Grid reference
Easting 549875, northing 180603
Licence area
London Power Networks (LPN)
Grid supply point
Littlebrook 132kV (LPN)
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
132 kV
Technology group
Bioenergy and waste
Energy source 1
Waste, Steam turbine (thermal power plant): 88.6 MW registered
Energy source 2
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 88.6 MW registered
Registered capacity
88.6 MW
Change to maximum export capacity
88.6 MW
Change to maximum import capacity
48.36 MW
Flexible connection
No
In a connection queue
Yes
Date accepted
14 Feb 2022
Date connected
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
102124-204327
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
14 Nov 2024
Tracked since
September 2026 edition

Change history

Tracked since the September 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Littlebrook 132kV (LPN)

GSP view

3 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 106 MW: 17 MW connected, 89 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?