Mccains Foods
McCain Foods (G.B.) Limited at Walpole
UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 28 Jul 2007
- Status
- Connected
- Customer
- McCain Foods (G.B.) Limited
- Site name
- Mccains Foods
- Address
- Funthams Lane, Walpole, Cambridgeshire, PE7 2PG
- Grid reference
- Easting 523780, northing 297300
- Licence area
- Eastern Power Networks (EPN)
- Grid supply point
- Walpole
- Bulk supply point
- Peterborough Central 33kV
- Primary substation
- Funthams Ln Primary 11kV
- Connection voltage
- 11 kV
- Technology group
- Wind
- Energy source 1
- Wind, Onshore wind turbines: 8 MW registered
- Registered capacity
- 8 MW
- Maximum export capacity
- 8 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- No
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1030045128531
- Import MPAN
- Not stated
- Last updated
- 15 Jan 2021
- Tracked since
- September 2026 edition
Change history
Tracked since the September 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Walpole
GSP view98 other sites at this grid supply point in the November 2026 edition, 1 of them at Funthams Ln Primary 11kV, the same primary substation. In all, the sites here total 3.3 GW: 1.3 GW connected, 2.0 GW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?