Lower Dunton Road

CedarTech Limited at Tilbury

UKPN Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
15 May 2026
Status
Connected
Customer
CedarTech Limited
Site name
Lower Dunton Road
Address
Upminster, Essex, RM14 3TD
Grid reference
Easting 566038, northing 186760
Licence area
Eastern Power Networks (EPN)
Grid supply point
Tilbury
Bulk supply point
Basildon Grid 33kV
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Storage
Energy source 1
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 28 MW registered
Registered capacity
28 MW
Maximum export capacity
28 MW
Maximum import capacity
28 MW
Flexible connection
No
In a connection queue
Yes
Date accepted
Not stated
Target energisation date
30 Oct 2024
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not published by UKPN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
14 Aug 2026
Tracked since
October 2026 edition

Change history

Tracked since the October 2026 edition.

Changes to its status, capacity, technology or customer, newest first.

No changes to show: it has been found in one edition.

Also at Tilbury

GSP view

23 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 444 MW: 216 MW connected, 228 MW accepted to connect.

See all 23

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose