London Road
Name not shown at Warley
UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 21 Sep 2023
- Status
- Connected
- Customer
- Name not shown
- Site name
- London Road
- Address
- Purfleet, Essex, RM19 1SD
- Grid reference
- Easting 556917, northing 177364
- Licence area
- Eastern Power Networks (EPN)
- Grid supply point
- Warley
- Bulk supply point
- Purfleet Grid 33kV
- Primary substation
- Purfleet Primary 11kV T1 & T2
- Connection voltage
- 33 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Gas, Steam-gas turbine (CCGT): 1.7 MW registered
- Registered capacity
- 1.7 MW
- Maximum export capacity
- 1.7 MW
- Maximum import capacity
- 0 MW
- Flexible connection
- No
- In a connection queue
- No
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1030081179889
- Import MPAN
- Not stated
- Last updated
- 14 Apr 2025
- Tracked since
- September 2026 edition
Change history
Tracked since the September 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Warley
GSP view22 other sites at this grid supply point in the November 2026 edition, 1 of them at Purfleet Primary 11kV T1 & T2, the same primary substation. In all, the sites here total 561 MW: 327 MW connected, 234 MW accepted to connect.
- Tesco Distribution CentreTesco PLC, Gas and other fossil, Purfleet Primary 11kV T1 & T2 primaryConnected1.2 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?