Lower Dunton Road
Cedartech Energy Limited at Warley
UKPN Embedded Capacity Register 2 – 1MW and above, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not stated
- Status
- Accepted to connect
- Customer
- Cedartech Energy Limited
- Site name
- Lower Dunton Road
- Address
- Upminster, Essex, RM14 3TD
- Grid reference
- Easting 566038, northing 186760
- Licence area
- Eastern Power Networks (EPN)
- Grid supply point
- Warley
- Bulk supply point
- Not stated
- Primary substation
- Not stated
- Connection voltage
- 132 kV
- Technology group
- Storage
- Energy source 1
- Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 98 MW registered
- Registered capacity
- 98 MW
- Change to maximum export capacity
- 98 MW
- Change to maximum import capacity
- 98 MW
- Flexible connection
- No
- In a connection queue
- Yes
- Date accepted
- 24 Sep 2024
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not published by UKPN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 13 Dec 2024
- Tracked since
- September 2026 edition
Change history
Found in the September 2026 edition only.
Changes to its status, capacity, technology or customer, newest first.
- October 2026 editionNot found in this edition by its MPAN, grid reference or name and postcode
No changes to show: it has been found in one edition.
Also at Warley
GSP view22 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 526 MW: 327 MW connected, 199 MW accepted to connect.
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose