QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Laurels Farm

Laurels Farm Renewable Power Limited at Bramford

UKPN Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
28 Sep 2025
Status
Accepted to connect
Customer
Laurels Farm Renewable Power Limited
Site name
Laurels Farm
Address
Beccles, Suffolk, NR34 8HD
Grid reference
Easting 638998, northing 289612
Licence area
Eastern Power Networks (EPN)
Grid supply point
Bramford
Bulk supply point
Ilketshall Grid 33kV
Primary substation
Barsham Primary 11kV
Connection voltage
11 kV
Technology group
Wind
Energy source 1
Wind, Onshore wind turbines: 2 MW registered
Registered capacity
2 MW
Change to maximum export capacity
2 MW
Change to maximum import capacity
0 MW
Flexible connection
No
In a connection queue
Yes
Date accepted
15 Dec 2020
Date connected
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not published by UKPN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
13 Sep 2024
Tracked since
September 2026 edition

Change history

Tracked since the September 2026 edition, across 2 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Bramford

GSP view

108 other sites at this grid supply point in the October 2026 edition, 2 of them at Barsham Primary 11kV, the same primary substation. In all, the sites here total 2.3 GW: 1 GW connected, 1.3 GW accepted to connect.

See all 108

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose