Guys Hospital
Powerplan Limited at New Cross 132kV
UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- Not stated
- Status
- Accepted to connect
- Customer
- Powerplan Limited
- Site name
- Guys Hospital
- Address
- Great Maze Pond, Lambeth, London, SE1 9RT
- Grid reference
- Easting 532730, northing 180143
- Licence area
- London Power Networks (LPN)
- Grid supply point
- New Cross 132kV
- Bulk supply point
- Not stated
- Primary substation
- Tooley St 11kV
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Oil, Engine (combustion / reciprocating): 3.6 MW registered
- Registered capacity
- 3.6 MW
- Change to maximum export capacity
- 3.6 MW
- Change to maximum import capacity
- 0 MW
- Flexible connection
- No
- In a connection queue
- Yes
- Date accepted
- 12 May 2016
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 14 Aug 2023
- Tracked since
- September 2026 edition
Change history
Tracked since the September 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at New Cross 132kV
GSP view4 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 41.1 MW: 37.5 MW connected, 3.6 MW accepted to connect.
- Level 3 CommunicationsLevel 3 Communications, Gas and other fossil, Osborn St B 11kV primaryConnected3.2 MW
- Citibank Data CentreCitibank Data Centre, Gas and other fossil, Deptford Grid 11kV primaryConnected1.47 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?