QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Gascoinge Estate Gen

B&D Energy at Barking West 33kV (LPN)

UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not stated
Status
Accepted to connect
Customer
B&D Energy
Site name
Gascoinge Estate Gen
Address
King Edwards Road, Barking, Essex, IG11 7JL
Grid reference
Easting 544574, northing 183770
Licence area
London Power Networks (LPN)
Grid supply point
Barking West 33kV (LPN)
Bulk supply point
Axe Street 11kV
Primary substation
Not stated
Connection voltage
11 kV
Technology group
Gas and other fossil
Energy source 1
Fossil - Gas, Engine (combustion / reciprocating): 1.22 MW registered
Registered capacity
1.22 MW
Change to maximum export capacity
1.22 MW
Change to maximum import capacity
0 MW
Flexible connection
No
In a connection queue
Yes
Date accepted
19 Aug 2021
Date connected
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
14 Feb 2025
Tracked since
September 2026 edition

Change history

Tracked since the September 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Barking West 33kV (LPN)

GSP view

8 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 56.9 MW: 51.9 MW connected, 5 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?