Crossness Sewage Treatment Works
Crossness Sewage Treatment Works at Barking West 33kV (LPN)
UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 10 Sep 2000
- Status
- Connected
- Customer
- Crossness Sewage Treatment Works
- Site name
- Crossness Sewage Treatment Works
- Address
- Belvedere Road, Thamesmead, London, SE2 9AQ
- Grid reference
- Easting 548516, northing 180926
- Licence area
- London Power Networks (LPN)
- Grid supply point
- Barking West 33kV (LPN)
- Bulk supply point
- Not stated
- Primary substation
- Not stated
- Connection voltage
- 33 kV
- Technology group
- Bioenergy and waste
- Energy source 1
- Waste, Steam turbine (thermal power plant): 5.896 MW registered
- Registered capacity
- 5.9 MW
- Maximum export capacity
- 5.9 MW
- Maximum import capacity
- Not stated
- Flexible connection
- No
- In a connection queue
- No
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- 1200061171324
- Import MPAN
- Not stated
- Last updated
- 16 May 2023
- Tracked since
- September 2026 edition
Change history
Tracked since the September 2026 edition, across 3 editions.
Changes to the details QueueWatch tracks, newest first.
No change to any detail QueueWatch tracks.
Also at Barking West 33kV (LPN)
GSP view8 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 56.9 MW: 51.9 MW connected, 5 MW accepted to connect.
- Crossness Sewage Treatment WorksCrossness Sewage Treatment Works, Gas and other fossilConnected11.06 MW
- Gallions PowerAMP Energy Services Limited, Gas and other fossil, Barking West 11kV primaryConnected5 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose