QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

FDG A-01 Ramsey Wind Farm NO 2

Abbey Group cambridgeshire Limited at Walpole

UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
6 Feb 2015
Status
Connected
Customer
Abbey Group cambridgeshire Limited
Site name
FDG A-01 Ramsey Wind Farm NO 2
Address
Ramsey, Huntingdon, Cambridgeshire, PE26 2SE
Grid reference
Easting 527814, northing 286445
Licence area
Eastern Power Networks (EPN)
Grid supply point
Walpole
Bulk supply point
Peterborough Central 33kV
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Wind
Energy source 1
Wind, Onshore wind turbines: 8 MW registered
Registered capacity
8 MW
Maximum export capacity
8 MW
Maximum import capacity
Not stated
Flexible connection
Yes
In a connection queue
No
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not stated
Export MPAN
1050000811220
Import MPAN
Not stated
Last updated
14 Nov 2023
Tracked since
September 2026 edition

Change history

Tracked since the September 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Walpole

GSP view

98 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 3.3 GW: 1.3 GW connected, 2.0 GW accepted to connect.

See all 98

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?