Enterprise Power

Enterprise Power at Richborough/Sellindge 132kV

UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
28 May 2021
Status
Connected
Customer
Enterprise Power
Site name
Enterprise Power
Address
Westwood Industrial Estate, Enterprise Way, Margate, Kent, CT9 4JD
Grid reference
Easting 635967, northing 168687
Licence area
South Eastern Power Networks (SPN)
Grid supply point
Richborough/Sellindge 132kV
Bulk supply point
Thanet Grid 33kV
Primary substation
Thanet 11kV
Connection voltage
11 kV
Technology group
Gas and other fossil
Energy source 1
Fossil - Gas, Engine (combustion / reciprocating): 5.07 MW registered
Registered capacity
5.07 MW
Maximum export capacity
5.07 MW
Maximum import capacity
Not stated
Flexible connection
Yes
In a connection queue
No
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not stated
Export MPAN
1900092013516
Import MPAN
1900092013507
Last updated
14 Mar 2023
Tracked since
September 2026 edition

Change history

Tracked since the September 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

  • October 2026 edition
    Capacity changed from 5 MW to 5.07 MW
  • October 2026 edition
    Export capacity changed from 5 MW to 5.07 MW

Also at Richborough/Sellindge 132kV

GSP view

29 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 640 MW: 540 MW connected, 100 MW accepted to connect.

See all 29

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?