QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Dengie Farm

Dengie Solar Park Limited at Rayleigh

UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
24 Sep 2025
Status
Connected
Customer
Dengie Solar Park Limited
Site name
Dengie Farm
Address
Keelings Road, Southminster, Essex, CM0 7JF
Grid reference
Easting 597805, northing 201416
Licence area
Eastern Power Networks (EPN)
Grid supply point
Rayleigh
Bulk supply point
Maldon Grid 33kV
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 13.75 MW registered
Energy source 2
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 13.75 MW registered
Registered capacity
13.75 MW
Maximum export capacity
13.75 MW
Maximum import capacity
5 MW
Flexible connection
Yes
In a connection queue
No
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not stated
Export MPAN
1050003603381/1050003603406/1050003603424
Import MPAN
Not stated
Last updated
16 Apr 2026
Tracked since
September 2026 edition

Change history

Tracked since the September 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Rayleigh

GSP view

45 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 1.1 GW: 0.5 GW connected, 0.6 GW accepted to connect.

See all 45

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?