Church Lane
Renewable Power Systems at Rayleigh
UKPN Embedded Capacity Register 2 – 1MW and above, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Date connected
- 24 Sep 2021
- Status
- Connected
- Customer
- Renewable Power Systems
- Site name
- Church Lane
- Address
- Colchester, Essex, CO3 8LS
- Grid reference
- Easting 594184, northing 223116
- Licence area
- Eastern Power Networks (EPN)
- Grid supply point
- Rayleigh
- Bulk supply point
- Abberton Grid 33kV
- Primary substation
- Shrub End Primary 11kV
- Connection voltage
- 11 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Gas, Steam-gas turbine (CCGT): 2.5 MW registered
- Registered capacity
- 2.5 MW
- Maximum export capacity
- 2.5 MW
- Maximum import capacity
- 0.06 MW
- Flexible connection
- No
- In a connection queue
- No
- Date accepted
- Not stated
- Target energisation date
- Not stated
- Distribution reinforcement reference
- Not published by UKPN
- Transmission reinforcement reference
- Not published by UKPN
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 14 Dec 2021
- Tracked since
- September 2026 edition
Change history
Found in the September 2026 edition only.
Changes to the details QueueWatch tracks, newest first.
- October 2026 editionNot found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode
No changes to show: it has been found in one edition.
Also at Rayleigh
GSP view46 other sites at this grid supply point in the November 2026 edition, 3 of them at Shrub End Primary 11kV, the same primary substation. In all, the sites here total 1.1 GW: 0.5 GW connected, 0.6 GW accepted to connect.
- Bellhouse LFGEnergy Developments (UK) Limited, Bioenergy and waste, Shrub End Primary 11kV primaryConnected6.1 MW
- Layer De La Haye WtwEssex & Suffolk Water PLC, Gas and other fossil, Shrub End Primary 11kV primaryConnected2 MW
- Colchester Borough Homes, Batch 3, Phase 1.Global Heat Source, Solar, Shrub End Primary 11kV primaryConnected1.02 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose
See how we’d price it: Sell now, or wait for your Gate 2 offer?