QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Bolney Solar

Enso Green Holdings Y Limited at Bolney

UKPN Embedded Capacity Register 2 – 1MW and above, October 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
31 Dec 2030
Status
Accepted to connect
Customer
Enso Green Holdings Y Limited
Site name
Bolney Solar
Address
Horsham Road, Steyning, West Sussex, BN44 3AB
Grid reference
Easting 517223, northing 113028
Licence area
South Eastern Power Networks (SPN)
Grid supply point
Bolney
Bulk supply point
Steyning Grid
Primary substation
Steyning Grid 33kV
Connection voltage
33 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 15 MW registered
Registered capacity
15 MW
Change to maximum export capacity
15 MW
Change to maximum import capacity
Not stated
Flexible connection
Yes
In a connection queue
Yes
Date accepted
20 Dec 2021
Date connected
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
Not published by UKPN
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
15 Apr 2024
Tracked since
September 2026 edition

Change history

Tracked since the September 2026 edition, across 2 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Bolney

GSP view

45 other sites at this grid supply point in the October 2026 edition. In all, the sites here total 1.4 GW: 0.6 GW connected, 0.8 GW accepted to connect.

See all 45

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose