QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Twineham Grange Manor,Coombes Solar

Bolney Green Energy Hub 1 Limited at Bolney

UKPN Embedded Capacity Register 2 – 1MW and above, November 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
31 Oct 2026
Status
Accepted to connect
Customer
Bolney Green Energy Hub 1 Limited
Site name
Twineham Grange Manor,Coombes Solar
Address
Haywards Heath, West Sussex, RH17 5NH
Grid reference
Easting 524599, northing 120616
Licence area
South Eastern Power Networks (SPN)
Grid supply point
Bolney
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
132 kV
Technology group
Storage
Energy source 1
Stored Energy (all stored energy irrespective of the original energy source), Storage - Electrochemical (Batteries): 49 MW registered
Registered capacity
49 MW
Change to maximum export capacity
49 MW
Change to maximum import capacity
49 MW
Flexible connection
No
In a connection queue
Yes
Date accepted
10 May 2017
Date connected
Not stated
Distribution reinforcement reference
Not published by UKPN
Transmission reinforcement reference
031885-031885
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
13 Nov 2026
Tracked since
September 2026 edition

What would CMP470’s commitment fee do to a battery like this? Read our study: Will CMP470’s commitment fee clear the battery queue?

Change history

Tracked since the September 2026 edition, across 3 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Bolney

GSP view

45 other sites at this grid supply point in the November 2026 edition. In all, the sites here total 1.4 GW: 0.6 GW connected, 0.8 GW accepted to connect.

See all 45

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?