QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Woodlands Farm Windfarm

Energised Environments Limited at Linnmill

SPEN Embedded Capacity Register >1MW, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 May 2017
Status
Connected
Customer
Energised Environments Limited
Site name
Woodlands Farm Windfarm
Address
Woodlands Farm, New Trows, Lesmahagow, Lanark, South Lanarkshire, ML11 0HQ
Grid reference
Easting 279167, northing 639245
Licence area
Central and Southern Scotland (SPD)
Grid supply point
Linnmill
Bulk supply point
Not stated
Primary substation
LESMAHAGOW (11kV)
Connection voltage
11 kV
Technology group
Wind
Energy source 1
Wind, Onshore wind turbines: 1.4 MW registered
Registered capacity
1.4 MW
Maximum export capacity
1.4 MW
Maximum import capacity
0 MW
Flexible connection
Yes
In a connection queue
No
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
1800060725703
Last updated
23 Sep 2025
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 6 editions. Not found at 1 MW or over in the July 2026 edition.

Changes to the details QueueWatch tracks, newest first.

  • September 2026 edition
    Status changed from “accepted to connect” to “connected”
  • September 2026 edition
    Target energisation date not stated (31 Oct 2028 in the August 2026 edition)
  • September 2026 edition
    Flexible connection changed from “no” to “yes”
  • September 2026 edition
    In a connection queue changed from “yes” to “no”
  • July 2026 edition
    Not found among this edition’s sites of 1 MW and over by its MPAN, grid reference or name and postcode
  • June 2026 edition
    Status changed from “connected” to “accepted to connect”
  • June 2026 edition
    Target energisation date stated as 31 Oct 2028 (not stated in the May 2026 edition)
  • June 2026 edition
    Flexible connection changed from “yes” to “no”
  • June 2026 edition
    In a connection queue changed from “no” to “yes”
  • May 2026 edition
    In a connection queue changed from “yes” to “no”

Also at Linnmill

GSP view

13 other sites at this grid supply point in the September 2026 edition, 1 of them at LESMAHAGOW (11kV), the same primary substation. In all, the sites here total 216 MW: 120 MW connected, 96 MW accepted to connect.

See all 13

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?