QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Shewalton Farm

North Ayrshire Council at Kilmarnock Town

SPEN Embedded Capacity Register >1MW, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
Not stated
Status
Connected
Customer
North Ayrshire Council
Site name
Shewalton Farm
Address
Shewalton Road, Shewalton, Irvine, North Ayrshire, KA11 5AN
Grid reference
Easting 233419, northing 636618
Licence area
Central and Southern Scotland (SPD)
Grid supply point
Kilmarnock Town
Bulk supply point
Not stated
Primary substation
RIVERSIDE (11kV)
Connection voltage
11 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 4.928 MW registered
Registered capacity
4.928 MW
Maximum export capacity
4.928 MW
Maximum import capacity
0 MW
Flexible connection
No
In a connection queue
No
Date accepted
2 Dec 2021
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
25 Nov 2022
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Kilmarnock Town

GSP view

7 other sites at this grid supply point in the September 2026 edition, 1 of them at RIVERSIDE (11kV), the same primary substation. In all, the sites here total 186 MW: 40 MW connected, 146 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?