Doveryard (Oldhall ERF)
Doveryard Ltd at Kilmarnock Town
SPEN Embedded Capacity Register >1MW, September 2026 edition
Site, company and substation names are shown as they appear in the registers, including capitalisation.
- Target energisation date
- 4 Sep 2026
- Status
- Accepted to connect
- Customer
- Doveryard Ltd
- Site name
- Doveryard (Oldhall ERF)
- Address
- Oldhall Industrial Estate, Irvine, North Ayrshire, KA11 5DG
- Grid reference
- Easting 233746, northing 636541
- Licence area
- Central and Southern Scotland (SPD)
- Grid supply point
- Kilmarnock Town
- Bulk supply point
- Not stated
- Primary substation
- Not stated
- Connection voltage
- 33 kV
- Technology group
- Gas and other fossil
- Energy source 1
- Fossil - Gas, Gas turbine (OCGT): 25 MW registered
- Registered capacity
- 25 MW
- Change to maximum export capacity
- 25 MW
- Change to maximum import capacity
- 2.5 MW
- Flexible connection
- No
- In a connection queue
- No
- Date accepted
- 31 May 2022
- Date connected
- Not stated
- Distribution reinforcement reference
- Not published by SPEN
- Transmission reinforcement reference
- Not stated
- Export MPAN
- Not stated
- Import MPAN
- Not stated
- Last updated
- 19 Feb 2025
- Tracked since
- March 2026 edition
Change history
Tracked since the March 2026 edition, across 7 editions.
Changes to the details QueueWatch tracks, newest first.
- September 2026 editionTarget energisation date moved from 29 Aug 2026 to 4 Sep 2026 (6 days later)
- August 2026 editionTarget energisation date moved from 27 Jul 2026 to 29 Aug 2026 (1 month later)
- May 2026 editionTarget energisation date moved from 27 May 2026 to 27 Jul 2026 (2 months later)
Also at Kilmarnock Town
GSP view7 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 186 MW: 40 MW connected, 146 MW accepted to connect.
- Glennon Generation (Adam Wilson and Sons)ADAM WILSON AND SONS LTD, Bioenergy and waste, TROON (11kV) primaryConnected2.3 MW
Price what a delay would do to your project
QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.
Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.
Get the plan that holds up best for your site, and where that answer flips.
What you get from QueueQuant
- The route to power that wins
- How to size every asset on the site
- The level of delay or curtailment at which that answer flips
- Whether the project is worth building at all
- How bad the worst outcomes get, at the risk level you choose