QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Schreiber

At Frodsham

SPEN Embedded Capacity Register >1MW, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
28 Nov 2019
Status
Connected
Customer
Not stated
Site name
Schreiber
Address
Astomoor Road, Runcorn, Runcorn, Wirral
Grid reference
Easting 353825, northing 383465
Licence area
Merseyside, Cheshire and North Wales (SPM)
Grid supply point
Frodsham
Bulk supply point
DUTTON GT2 / MOORE GT1 / PERCIVAL LA GT1
Primary substation
ASTMOOR IND EST T1 / MACKAMAX T1 / MERSEY RD T1 / PICOW FARM RD T1
Connection voltage
33 kV
Technology group
Gas and other fossil
Energy source 1
Fossil - Gas, Steam-gas turbine (CCGT): 1.56 MW registered
Registered capacity
1.56 MW
Maximum export capacity
1.56 MW
Maximum import capacity
2.4 MW
Flexible connection
Not stated
In a connection queue
No
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
Not stated
Export MPAN
1300035356237
Import MPAN
1300051517729
Last updated
4 Oct 2024
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to the details QueueWatch tracks, newest first.

No change to any detail QueueWatch tracks.

Also at Frodsham

GSP view

15 other sites at this grid supply point in the September 2026 edition, 2 of them at ASTMOOR IND EST T1 / MACKAMAX T1 / MERSEY RD T1 / PICOW FARM RD T1, the same primary substation. In all, the sites here total 376 MW: 233 MW connected, 143 MW accepted to connect.

See all 15

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?