QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Pickhill Bridge Farm

Next Energy Capital at Legacy

SPEN Embedded Capacity Register >1MW, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
Not stated
Status
Connected
Customer
Next Energy Capital
Site name
Pickhill Bridge Farm
Address
Pickhill Bridge Farm, Cross Lanes, Cross Lanes, Dee Valley and Mid Wales, LL13 0UH
Grid reference
Easting 338863, northing 348753
Licence area
Merseyside, Cheshire and North Wales (SPM)
Grid supply point
Legacy
Bulk supply point
BRYMBO GT1 / LEGACY LOCAL GT1 / MARCHWIEL GT1 / MARCHWIEL GT2 / WREXHAM GT1
Primary substation
DEESIDE ALUMINIUM T1 / DUNLOP PLASTICS T1 / FIRESTONE T1 / TETRAPAK T1
Connection voltage
33 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 3 MW registered
Registered capacity
3 MW
Maximum export capacity
3 MW
Maximum import capacity
0 MW
Flexible connection
Not stated
In a connection queue
No
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
Not stated
Export MPAN
1300060710208
Import MPAN
1300060710192
Last updated
11 Nov 2020
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Legacy

GSP view

48 other sites at this grid supply point in the September 2026 edition, 1 of them at DEESIDE ALUMINIUM T1 / DUNLOP PLASTICS T1 / FIRESTONE T1 / TETRAPAK T1, the same primary substation. In all, the sites here total 615 MW: 328 MW connected, 287 MW accepted to connect.

See all 48

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose