Moorshield Windfarm [Soame Windfarm]

Wind 2 Ltd at Giffnock

SPEN Embedded Capacity Register >1MW, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
28 Feb 2028
Status
Accepted to connect
Customer
Wind 2 Ltd
Site name
Moorshield Windfarm [Soame Windfarm]
Address
Moorshield Wind Farm, Newton Mearns, East Renfrewshire, G77 6SQ
Grid reference
Easting 251621, northing 649554
Licence area
Central and Southern Scotland (SPD)
Grid supply point
Giffnock
Bulk supply point
Not stated
Primary substation
CASTLE (33kV)
Connection voltage
33 kV
Technology group
Wind
Energy source 1
Wind, Onshore wind turbines: 18 MW registered
Registered capacity
18 MW
Change to maximum export capacity
18 MW
Change to maximum import capacity
0 MW
Flexible connection
No
In a connection queue
No
Date accepted
20 May 2025
Date connected
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
28 Oct 2022
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Giffnock

GSP view

6 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 118 MW: 6 MW connected, 112 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose