QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Iceland

Iceland Frozen Foods Ltd at Connahs Quay

SPEN Embedded Capacity Register >1MW, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
Not stated
Status
Accepted to connect
Customer
Iceland Frozen Foods Ltd
Site name
Iceland
Address
Deeside Industrial Park, Deeside, Wirral, CH5 2NW
Grid reference
Easting 332836, northing 371269
Licence area
Merseyside, Cheshire and North Wales (SPM)
Grid supply point
Connahs Quay
Bulk supply point
DEESIDE PK GRID GT1 / SIXTH AVE GRID GT1
Primary substation
OPTICAL FIBRES T1 / SHOTWICK T1 / WALBRO T1
Connection voltage
33 kV
Technology group
Solar
Energy source 1
Solar, Photovoltaic: 0.9 MW registered
Energy source 2
Fossil - Gas, Steam-gas turbine (CCGT): 2 MW registered
Registered capacity
2.9 MW
Change to maximum export capacity
2.9 MW
Change to maximum import capacity
0 MW
Flexible connection
Not stated
In a connection queue
Yes
Date accepted
Not stated
Date connected
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
14 Sep 2020
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

  • July 2026 edition
    Status changed from “connected” to “accepted to connect”
  • July 2026 edition
    Technology changed from Gas and other fossil to Solar
  • June 2026 edition
    Status changed from “accepted to connect” to “connected”
  • June 2026 edition
    Technology changed from Solar to Gas and other fossil
  • April 2026 edition
    Status changed from “connected” to “accepted to connect”
  • April 2026 edition
    Technology changed from Gas and other fossil to Solar

Also at Connahs Quay

GSP view

31 other sites at this grid supply point in the September 2026 edition, 1 of them at OPTICAL FIBRES T1 / SHOTWICK T1 / WALBRO T1, the same primary substation. In all, the sites here total 459 MW: 281 MW connected, 178 MW accepted to connect.

See all 31

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose