QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

Glenchamber Windfarm

Res Ltd at Glenluce

SPEN Embedded Capacity Register >1MW, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
1 Jun 2016
Status
Connected
Planning consent
Granted on appeal 31 Jul 2012
Dumfries and Galloway, reference 10/P/1/0494 · Source: REPD
Customer
Res Ltd
Site name
Glenchamber Windfarm
Address
Glenchamber Wind Farm, Newton Stewart, Dumfries and Galloway, DG8 0PB
Grid reference
Easting 223765, northing 566671
Licence area
Central and Southern Scotland (SPD)
Grid supply point
Glenluce
Bulk supply point
Not stated
Primary substation
Not stated
Connection voltage
33 kV
Technology group
Wind
Energy source 1
Wind, Onshore wind turbines: 27.5 MW registered
Registered capacity
27.5 MW
Maximum export capacity
27.5 MW
Maximum import capacity
0 MW
Flexible connection
Yes
In a connection queue
No
Date accepted
Not stated
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
Not stated
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
14 Jul 2020
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to the details QueueWatch tracks, newest first.

  • May 2026 edition
    In a connection queue changed from “yes” to “no”

Also at Glenluce

GSP view

7 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 145 MW: 111 MW connected, 34 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs’ published connection registers. It doesn’t tell you what to do about it. That’s what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose

See how we’d price it: Sell now, or wait for your Gate 2 offer?

Planning consent

The planning decision or stage for this site, from DESNZ’s Renewable Energy Planning Database (REPD), October 2026 edition, with the planning authority and its reference. QueueWatch matched the site to that record. The register’s status can lag behind planning decisions, so the two may differ.

How QueueWatch matches projects · Spotted a wrong match? Email info@queuequant.com.