Forrestfield Windfarm

West Cost Energy at Bathgate

SPEN Embedded Capacity Register >1MW, August 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Target energisation date
29 Nov 2026
Status
Accepted to connect
Customer
West Cost Energy
Site name
Forrestfield Windfarm
Address
Site South Of, Airdrie Road, Caldercruix, Airdrie, North Lanarkshire, ML6 8NX
Grid reference
Easting 286255, northing 665690
Licence area
Central and Southern Scotland (SPD)
Grid supply point
Bathgate
Bulk supply point
Not stated
Primary substation
ARMADALE (11kV)
Connection voltage
11 kV
Technology group
Wind
Energy source 1
Wind, Onshore wind turbines: 10 MW registered
Registered capacity
10 MW
Change to maximum export capacity
9 MW
Change to maximum import capacity
0 MW
Flexible connection
Yes
In a connection queue
Yes
Date accepted
14 May 2024
Date connected
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
SPT-RI-123, SPT-RI-2415, SPT-RI-254, SPT-RI-269, SPT-RI-3383, SPT-RI-4100
Export MPAN
Not stated
Import MPAN
Not stated
Last updated
14 Jul 2020
Tracked since
March 2026 edition

Change history

Tracked from the March 2026 edition to the August 2026 edition, across 6 editions.

Changes to its status, capacity, technology or customer, newest first.

  • September 2026 edition
    Not found in this edition by its MPAN, grid reference or name and postcode

No change to its status, capacity, technology or customer.

Also at Bathgate

GSP view

17 other sites at this grid supply point in the September 2026 edition, 5 of them at ARMADALE (11kV), the same primary substation. In all, the sites here total 195 MW: 90 MW connected, 105 MW accepted to connect.

See all 17

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose