QueueWatchby QueueQuant Price my project Get the plan that holds up best for your site, and where that answer flips.

East Mains Generating Plant

Grid Connection Consulting at Broxburn

SPEN Embedded Capacity Register >1MW, September 2026 edition

Site, company and substation names are shown as they appear in the registers, including capitalisation.

Date connected
26 May 2023
Status
Connected
Customer
Grid Connection Consulting
Site name
East Mains Generating Plant
Address
24 Grange Knowe, Linlithgow, West Lothian, EH49 7HX
Grid reference
Easting 309228, northing 672428
Licence area
Central and Southern Scotland (SPD)
Grid supply point
Broxburn
Bulk supply point
Not stated
Primary substation
EAST MAINS (11KV)
Connection voltage
11 kV
Technology group
Gas and other fossil
Energy source 1
Fossil - Gas, Gas turbine (OCGT): 10 MW registered
Registered capacity
10 MW
Maximum export capacity
10 MW
Maximum import capacity
0 MW
Flexible connection
No
In a connection queue
No
Date accepted
25 Feb 2019
Target energisation date
Not stated
Distribution reinforcement reference
Not published by SPEN
Transmission reinforcement reference
Not stated
Export MPAN
1800061168987
Import MPAN
1800061168978
Last updated
14 Sep 2020
Tracked since
March 2026 edition

Change history

Tracked since the March 2026 edition, across 7 editions.

Changes to its status, capacity, technology or customer, newest first.

No change to its status, capacity, technology or customer.

Also at Broxburn

GSP view

4 other sites at this grid supply point in the September 2026 edition. In all, the sites here total 196 MW: 99 MW connected, 97 MW accepted to connect.

QueueQuant

Price what a delay would do to your project

QueueWatch reports what changed in the DNOs' published connection registers. It doesn't tell you what to do about it. That's what QueueQuant is for.

Give QueueQuant a site and it compares every way you could power it, on the grid or off it: waiting for the firm date, taking a non-firm offer, building a private wire or going off-grid, across every combination of contracted capacity, generation and battery. That’s millions of possible plans, each tested against thousands of possible futures for delay, curtailment and price. It returns the one plan that holds up best, even when that plan is not to build.

Price my project

Get the plan that holds up best for your site, and where that answer flips.

What you get from QueueQuant

  • The route to power that wins
  • How to size every asset on the site
  • The level of delay or curtailment at which that answer flips
  • Whether the project is worth building at all
  • How bad the worst outcomes get, at the risk level you choose